Products
Platform
Research
Market
Learn
Partner
Support
IPO

R

Ramky Infrastructure Share Price

486.95
-14.10 (-2.81%)
RAMKY • 20 Jan, 2026 | 03:29 PM
Buywith MTF at 2.50x leverage

1Y Annualised Return

-13.32%

3Y Annualised Return

17.09%

5Y Annualised Return

58.98%

10Y Annualised Return

31.61%

The current prices are delayed, login or Open Demat Account for live prices.

Ramky Infrastructure Stock Performance

1W Return-2.64
1Y Return-15.76
Today's Low485
Prev. Close501.05
Mkt Cap (Cr.)3,467.16
1M Return-12.07
3Y Return57.33
52-Week High705
Open495.50
PE Ratio16.78
6M Return-20.75
Today's High500.75
52-Week Low402.25
Face Value10

Ramky Infrastructure Company background

Founded in: 1994
Managing director: Y R Nagaraja
Ramky Infrastructure Limited was originally incorporated on April 13, 1994 as a private limited Company as Ramky Engineers Private Limited. The company was established to undertake construction projects. On June 23, 2003, the company changed the name from Ramky Engineers Private Limited to Ramky Infrastructure Private Limited. On June 24, 2004, the status got converted into public limited Company and the name of company was changed to Ramky Infrastructure Limited.The Company is an integrated construction and infrastructure development and management company in India. The company is in the business of a diverse range of construction and infrastructure projects in sectors as varied as water and waste water, transportation, irrigation, industrial parks (including SEZs), power transmission and distribution, residential, commercial and retail property. The company is headquartered in Hyderabad with five zonal offices and three regional offices throughout India and an overseas office in Sharjah, UAE.The company operates in two principal business segments: (i) a construction business, which is operated by the company, and (ii) a developer business, which comprises nine of the Subsidiaries and the Associate. In addition to their construction business and developer business the companys 100% owned subsidiary in the United Arab Emirates, operates a small consultancy business in areas such as infrastructure development, waste management, environment and property development.The company primarily entered into three types of contracts in the construction business: engineering, procurement and construction (EPC) contracts lumpsumturnkey (LSTK) contracts and item rate contracts. They own a large fleet of sophisticated construction equipment, including: crushing plants, hot mix plants, wet mix plants, asphalt batching plants, concrete batching plants, excavators, rock breakers, graders, pavers, compactors, tower cranes, dozers, bar bending and cutting machines.In the year 1995, the company expanded their operations to include water and waste water segment projects. In the year 1997, they further expanded their operations which include government works in addition to private contracting..In the year 1998, the company diversified into construction and began to undertake civil and environmental EPC projects and they expanded their operations into roads, buildings, irrigation and industrial construction. In the year 2002, the company expanded their area of operations with projects in the states of Tamil Nadu, Karnataka, Kerala, Maharashtra, Gujarat, Rajasthan, Punjab, Delhi, Uttar Pradesh, West Bengal and Orissa.In the year 2005, the company received the Best Contractor award from the Government of Rajasthan. They also received Indian Concrete Institutes 2005 Outstanding Concrete Structure Award for Gandhi Medical College and Hospital Complex in Hyderabad. The company commenced the construction of Asias largest sewage treatment plants (172 MLD) with uplift anaerobic sludge blanket process, at Nagole Hyderabad.In the year 2006, the company entered into a share subscription and shareholders agreement with SAPE and Tara India Fund III for purchase of equity shares and securities of the company. They expanded their operations that include power transmission projects. Also, the company completed the construction of Paryatak Bhavan Complex in Hyderabad, a venture with the Andhra Pradesh Tourism Development Corporation.In the year 2007, the company launched Ramky Elsamex Hyderabad Ring Road Ltd, an SPV for the development and construction of the Hyderabad Ring Road, a 150m wide road cum area development corridor with an eight lane controlled access expressway. Also, they commenced the developer business during the year.In the year 2008, the company received the Best Project Award for the Married Accommodation Project at Amritsar from Central Public Works Department, GOI. Also, they received Infrastructure Excellence Award 2008 in the Urban Infrastructure Category from CNBC TV18 Essar Steel. In September 2008, the company received a Rs 250 crore building contract for one of the IIIT (Rajiv Gandhi University of Knowledge Technologies) by Andhra Pradesh Government at Nuziveedu in Krishna District.In the year 2009, the company received an award for commendable water conserverwaste water management by the Water Digest. In the year 2010, the company received Greentech Safety Silver Award 2010 from M/s Greentech Foundation. Also, they received ISO 9001:2008 certification in accordance with TUV NORD CERT procedures for the entire operations of the company. In January 2010, the company bagged The Water Digest Water Awards 20092010 under Best Water Conserver Waste Water Management Category for 80 MLD Airoli Project at Mumbai. Also, they secured major projects across the nation at Bangalore, Raigarh, Naya Raipur, Bhopal, Puducherry, and Indore worth Rs.700.40 crore.In March 2010, the company bagged major projects across the nation at Karnataka, Uttar Pradesh, Kanpur, Akola aggregating to Rs.1054.46 crore for earthwork excavation, formation of embankment, lining and construction of cross drainage works, storm water drains, underground drainage system, roads, building project. They secured a Rs 670 crore contract from ILFS Transportation Networks Ltd for the widening of 2/4 lane Moradabad to Bareli (chainage 148 K.M. 190 K.M.), Uttar Pradesh. Also, they bagged three projects in Assam and Bihar worth Rs 497.89 crore.In May 2010, the consortium comprising of 50:50 joint venture between the company and ILFS Transportation Networks Ltd received a letter of award by the National Highways Authority of India for four Laning of Jorabat Shillong (Barapani) Section of NH40 from Km 0,000 to Km 61.800 in the State of Assam Meghalaya on Design, Build, Finance, Operate and Transfer (DBFOT) pattern under Special Accelerated Road Development Programme North East. In June 2010, the company bagged two projects in Andhra Pradesh, and Haryana worth Rs1507.4 crore. Also, they company bagged an order of Rs 310.56 crore from the Haryana State Industrial Infrastructure Development Corporation Ltd, for infrastructure, to be developed on turnkey basis.In July 2010, the company bagged eight projects in Karnataka, Madhya Pradesh, Andhra Pradesh, West Bengal, Uttar Pradesh and Puducherry aggregating Rs 10.52 billion. In August 2010, the company bagged nine projects across the nation at Karnataka, Madhya Pradesh, Andhra Pradesh, West Bengal, Uttar Pradesh, and Puducherry worth Rs 1009.56 crore.In 2011, the Company completed the Outer Ring Road to Hyderabad city. In 2012, it launched 2 DBFOT projects in 2013, it opened Regulator cum bridge, Chamravottam, one of the largest bridge in Kerala in 2014, it commissioned the largest State Road BOT Project viz NAM Expressway Ltd in Andhra Pradesh and Telangana.In 2015, it commissioned the Design, Build, Operate and Construct of Kadana Dam based bulk pipe line scheme for Dahod City Gujarat in 2016, it commissioned one of the largest Water Treatment Plant (410 MLD) in Telangana in 2017, it completed Indian Institute of Foreign Trade (IIFT) Kolkata, in West Bengal thereafter, opened Govindpur Jamtara Dumka Sahebganj Highway in the State of Jharkhand and completed the construction of Indian Institute of Science at Bangalore.In 2021, the Company completed 2 Million sq. ft of Residential Township Project at Kanpur in 2022, it commissioned the Jawaharnagar Leachate Treatment Plant .Ever Blooming Eco Solutions Limited was incorporated as a subsidiary in 202223. In 2024, first Single Waste to Energy Boiler of the largest capacity (800TPD) in India to produce 14.5 MW waste to energy at Dundigal, Hyderabad was successfully handed over by RIL and currently is in operation. 2,200 cum. of raft was built with the single highest pouring rate of 46 cum/hr completed in record time at Genext commercial building (IT square of 4 parking floor and 11 office floors). The 2 MLD Leachate Treatment Plant was inaugurated on 15th April 2023. Eco Carbon Engineering Solutions Limited has been incorporated in FY 202324.In FY 2025, Company completed the Ramky Elsamex Hyderabad Ring Road Limited project (REHRRL) it offloaded Narketpally, Addanki and Medarmetla (NAM) Road project thereby generating revenue to fund existing legacy projects it commissioned and maintained the Infrastructure Facility and CETP at Visakha Pharmacity Limited (VPCL) to cater to infrastructure needs of Pharmaceutical Companies Operating in the pharma park and treating their effluents. Also, Company completed the Srinagar Banihal Expressway Limited (SBEL) project. Chennai Biomining Limited has been incorporated as a Wholly Owned Subsidiary of the Company in 2025.

Ramky Infrastructure Financial Highlights


For the full year FY2025–2026, revenue reached ₹2210.45 crore and profit touched at ₹210.49 crore.

Ramky Infrastructure Share Price Today


As of 20 Jan 2026, Ramky Infrastructure share price is ₹487. The stock opened at ₹495.5 and had closed at ₹501 the previous day. During today’s trading session, Ramky Infrastructure share price moved between ₹485.00 and ₹500.75, with an average price for the day of ₹492.88. Over the last 52 weeks, the stock has recorded a low of ₹402.25 and a high of ₹705.00. In terms of performance, Ramky Infrastructure share price has declined by 20.8% over the past six months and has declined by 13.32% over the last year.
Read More
Ramky Infrastructure SIP Return Calculator
5,000
Over the past
Total Investment of ₹0
Monthly SIP of 5,000 would have become 0 in 5 years with a gain of 0 (+0.00%)
View details of Market Depth

Ramky Infrastructure Fundamental

Market Cap (in crs)

3,467.16

Face Value

10

Turnover (in lacs)

228.46

Key Metrics

Qtr Change %
30.93% Fall from 52W High
-24.8
Dividend yield 1yr %
0

Ramky Infrastructure Key Financials

View more
Loading chart...
Ramky Infrastructure Quarterly Revenue
Ramky Infrastructure Yearly Revenue
Ramky Infrastructure Quarterly Net Profit/Loss
Ramky Infrastructure Yearly Net Profit/Loss

Ramky Infrastructure Result Highlights

  • Ramky Infrastructure Ltd reported a 20.1% quarter-on-quarter (QoQ) increase in its consolidated revenues for the quarter-ended Sep (Q2 FY 2025-26). On a year-on-year (YoY) basis, it witnessed a decline of 6.1%.

  • Its expenses for the quarter were up by 24.1% QoQ and down 4.5% YoY.

  • The net profit decreased 1.8% QoQ and decreased 8.9% YoY.

  • The earnings per share (EPS) of Ramky Infrastructure Ltd stood at 10.87 during Q2 FY 2025-26.

    Read more

Data Source: BSE, Company announcements

The securities quoted are exemplary and are not recommendatory. Past performance is not indicative of future results.

Ramky Infrastructure Shareholding Pattern

Promoter
69.8%
Foreign Institutions
1.2%
Domestic Institutions
0.8%
Public
28.2%

Ramky Infrastructure Technical Analysis

Moving Averages Analysis
486.95
Current Price
Bullish Moving Averages
0
Bearish Moving Averages
16
Day EMA5
499.10
Day EMA10
509.90
Day EMA12
513.70
Day EMA20
526.20
Day EMA26
533.80
Day EMA50
554.20
Day EMA100
566.90
Day EMA200
567.60
Delivery & Volume
Loading chart...

Day

67.60%

Week

60.00%

Month

58.60%

Delivery & Volume

490.90
Pivot
Resistance
First Resistance
496.80
Second Resistance
506.65
Third Resistance
512.55
Support
First Support
481.05
Second support
475.15
Third Support
465.30
Relative Strength Index
26.97
Money Flow Index
18.11
MACD
-20.12
MACD Signal
-16.71
Average True Range
17.34
Average Directional Index
27.14
Rate of Change (21)
-10.37
Rate of Change (125)
-20.75
Compare

Ramky Infrastructure Latest News

07 JAN 2026 | Wednesday
07 JAN 2026 | Wednesday
29 DEC 2025 | Monday

Please be aware that Ramky Infrastructure stock prices are subject to continuous fluctuations due to various factors.

Open Demat Account