Products
Platform
Research
Market
Learn
Partner
Support
IPO

T

Twamev Construction & Infrastructure Share Price

22.44
-1.09 (-4.63%)
TICL • 20 Jan, 2026 | 03:29 PM

1Y Annualised Return

-54.41%

3Y Annualised Return

21.36%

5Y Annualised Return

57.48%

10Y Annualised Return

1.15%

The current prices are delayed, login or Open Demat Account for live prices.

Twamev Construction & Infrastructure Stock Performance

1W Return-6.50
1Y Return-57.53
Today's Low22.36
Prev. Close23.53
Mkt Cap (Cr.)364.72
1M Return-11.44
3Y Return66.22
52-Week High59.23
Open23.52
PE Ratio3.69
6M Return-25.22
Today's High23.53
52-Week Low19.35
Face Value1

Twamev Construction & Infrastructure Company background

Founded in: 1964
Twamev Construction Infrastructure Limited was initially incorporated on December 4, 1964 as Tantia Constructions Company Private Limited. The Company became public limited Company in 1982 and the name of the Company was changed to Tantia Constructions Limited on December 29, 2005. Further, the Company has changed its name from Tantia Constructions Limited to Twamev Construction and Infrastructure Limited with effect from 27th November, 2024. The Company is one of the most proficient civil infrastructure solutions providers in India. It is engaged in executing critical infrastructure projects. It began operations in railways segment and over the years expanded to six other core infrastructure segments namely roads, urban development, infrastructure and industrial fabrication, power, marine and aviation.Furthermore, it engaged in general civil infrastructure solutions and executing infrastructure projects. It also specialized into the railway infrastructure, bridges, Roads Highways, power transmission, pipelines, aviation, marine, urban development and buildings hospital. They have built roadways in the hills of Mizoram, coastal areas of Kerala, plains of Punjab and the hard plateau of Karnataka.In 1968, the company ventured into the building of bridges on well foundation. In the year 1976, they entered the premium segment of large diameter boring piles foundation for bridges and buildings. The company became a public limited company on May 27, 1982. In the year 1990, they entered advanced mechanized road construction in line with the specifications of the Ministry of Surface Transport.In the year 1992, the company got largest single order of Rs 12 crore in Northeast India. Also, they constructed a guidebund on the River Brahmaputra and a road deck of 2.2 km bridge over the River Brahmaputra in Joghigopa, Assam. Since 1996, they received tenders for construction of Coastal Embankments, Hydraulic structures, Marine Infrastructure, Jetties. In the year 1997, the company entered Bangladesh to develop coastal and marine infrastructure. In the year 1998, they bagged NH 1 assignment from Panipat to Karnal. In the year 2001, they entered the niche sector of steel grider bridges and cantilever erection. Also, they completed a 1.25kmlong bridge from foundationtofinish over the River Saryu, Ayodhya. In the year 2003, the company won the prestigious JBICfunded dereservation of 15km tram tracks in Kolkata. In the year 2005, they bagged ADBfunded assignment of laying sewerage and drainage pipelines in Kolkata. Also, they entered the power transmission sector during the year.Since 2005, they started setting up of Transmission Lines and Airport Terminals: Aviation Infrastructure. The equity shared of the company was listed on Bombay Stock Exchange Ltd with effect from April 28, 2006.In the year 2006, the company completed the tram track project in Kolkata. In June 2006, they received two construction projects, namely construction of infrastructure work foundation work and construction of super structure work for bridge over river Krishna. In July 2006, the company secured a railway project worth Rs 195.31 million from North Central Railway, Allahabad for procurement, fabrication, assembly, erection and launching of 10 x 61 metre open web girder spans including fabrication and fixing of steel channel sleeper for Yamuna Bridge between Bhind and Etawah section in Uttar Pradesh.In the year 2007, the company completed the 220kv transmission line, Kumbhi Chini Mills project, a 64km state highway project in Karnataka, a Rs 157crore Patna road project and slum development project in Kolkata.In March 2007, the company received various new projects such as a project from West Bengal State Electricity Board for 33KV line in Rajarhat, Saltlake, Kolkata, a construction project of proposed six lane road over bridge at Bailey Road at the heart of city Patna from East Central Railway and a vision project of Chief Minister of Bihar for construction of major state highways in the districts of Buxar and Bhabua from Central Public Works Department.In November 2008, the company received 12 orders which included an order to build steel girders for Ircon International Ltd, and another from the Delhi Metro Rail Corp. In December 2008, they received order worth Rs 423.3 million to upgrade two hospitals in Mizoram.In December 2009, the company received a project for Construction of Road under Bridge near existing Railway level in DelhiBhatinda Section from Municipal Corporation of Delhi. In February 2010, they received a project from Brahmaputra Cracker and Polymer Ltd. for civil and structural works of ECU unit for Brahmaputra Petrochemicals Complex at Lapatkata, Assam.In 2010, the Company got into the BOT space through two projects, including Rs. 42 crore parkingcumcommercial project in Shimla and Rs 375 crore road project of 70 km in Bihar for NHAI. It made improvements and upgradation of state roads in Mizoram worth Rs 230 Crores.In 201112, it commissioned the ready mix concrete (RMC) plant at Guwahati. It completed the construction of a sewerage and drainage for BoroughI including House Connection at Kashipur, West Bengal. It completed installation of a 14 MLD Sewage Treatment Plant in Rajarhat.In 201314, it completed construction of foundation and substructure of bridge over River Matla, and other ancillary works in connection with Extension of New B G line beyond Canning to Bhangankhali costing Rs 50.35 Crores construction of 37 kms of RCC NP3 (modified) Gravity Sewer pipeline of varying diameters for KEIP, Kolkata at a contracted value of Rs 115.67 Crores construction of bridge across river Paglachandi in between stations Debogram and Paglachandi worth Rs 21.83 Crores Construction of 1.8 km long tunnel on a realigned path in connection with Udhampur Srinagar Baramulla Rail Link Project at a contracted value Rs 100 crores construction of Sewerage Drainage for Borough XV including House Connection for KEIP, Kolkata at a contracted value of Rs 106.09 crores construction of Inland Water Transport Terminal High Level Permanent RCC jetty over River Hooghly Khidirpore, Kolkata worth Rs 34.98 crores.In 2022, the Company launched the completion and handling over of a landmark project at Mizoram Improvement and Upgradation Serchhip to Buarpui Road.

Twamev Construction & Infrastructure Financial Highlights


For the full year FY2025–2026, revenue reached ₹163.89 crore and profit touched at ₹55.98 crore.

Twamev Construction & Infrastructure Share Price Today


As of 20 Jan 2026, Twamev Construction & Infrastructure share price is ₹22.4. The stock opened at ₹23.5 and had closed at ₹23.5 the previous day. During today’s trading session, Twamev Construction & Infrastructure share price moved between ₹22.36 and ₹23.53, with an average price for the day of ₹22.95. Over the last 52 weeks, the stock has recorded a low of ₹19.35 and a high of ₹59.23. In terms of performance, Twamev Construction & Infrastructure share price has declined by 25.2% over the past six months and has declined by 54.41% over the last year.
Read More
Twamev Construction & Infrastructure SIP Return Calculator
5,000
Over the past
Total Investment of ₹0
Monthly SIP of 5,000 would have become 0 in 5 years with a gain of 0 (+0.00%)
View details of Market Depth

Twamev Construction & Infrastructure Fundamental

Market Cap (in crs)

364.72

Face Value

1

Turnover (in lacs)

17.46

Key Metrics

Qtr Change %
62.11% Fall from 52W High
-30.9
Dividend yield 1yr %
0

Twamev Construction & Infrastructure Key Financials

View more
Loading chart...
Twamev Construction & Infrastructure Quarterly Revenue
Twamev Construction & Infrastructure Yearly Revenue
Twamev Construction & Infrastructure Quarterly Net Profit/Loss
Twamev Construction & Infrastructure Yearly Net Profit/Loss

Twamev Construction & Infrastructure Result Highlights

  • Twamev Construction & Infrastructure Ltd reported a 1.2% quarter-on-quarter (QoQ) increase in its consolidated revenues for the quarter-ended Sep (Q2 FY 2025-26). On a year-on-year (YoY) basis, it witnessed a growth of 1.5%.

  • Its expenses for the quarter were down by 17.4% QoQ and 22.4% YoY.

  • The net profit increased 196.4% QoQ and increased 1064.3% YoY.

  • The earnings per share (EPS) of Twamev Construction & Infrastructure Ltd - at - during Q2 FY 2025-26.

    Read more

Data Source: BSE, Company announcements

The securities quoted are exemplary and are not recommendatory. Past performance is not indicative of future results.

Twamev Construction & Infrastructure Shareholding Pattern

Promoter
84.5%
Domestic Institutions
0.4%
Public
15.1%

Twamev Construction & Infrastructure Technical Analysis

Moving Averages Analysis
22.44
Current Price
Bullish Moving Averages
0
Bearish Moving Averages
16
Day EMA5
24.00
Day EMA10
24.20
Day EMA12
24.20
Day EMA20
24.50
Day EMA26
24.80
Day EMA50
25.90
Day EMA100
27.10
Day EMA200
29.40
Delivery & Volume
Loading chart...

Day

100.00%

Week

100.00%

Month

100.00%

Delivery & Volume

23.83
Pivot
Resistance
First Resistance
24.15
Second Resistance
24.76
Third Resistance
25.08
Support
First Support
23.22
Second support
22.90
Third Support
22.29
Relative Strength Index
39.11
Money Flow Index
79.91
MACD
-0.63
MACD Signal
-0.73
Average True Range
1.22
Average Directional Index
26.07
Rate of Change (21)
-8.55
Rate of Change (125)
-17.70
Compare

Twamev Construction & Infrastructure Latest News

05 JAN 2026 | Monday
26 DEC 2025 | Friday
08 DEC 2025 | Monday

Please be aware that Twamev Construction & Infrastructure stock prices are subject to continuous fluctuations due to various factors.

Open Demat Account