kotak-logo
ATV Projects India Share Price

ATV Projects India Share Price

32.6
+0.24 (0.74%)
ATVPR • 06 Mar, 2026 | 03:29 PM

1Y Annualised Return

-1.16%

3Y Annualised Return

56.21%

5Y Annualised Return

47.47%

10Y Annualised Return

14.58%

ATV Projects India Stock Performance

1W Return1.62
1Y Return-0.43
Today's Low32.5
Prev. Close32.36
Mkt Cap (Cr.)173.16
1M Return-5.81
3Y Return273.00
52-Week High44.79
Open33.20
PE Ratio22.64
6M Return-14.48
Today's High33.2
52-Week Low28
Face Value10

ATV Projects India Company background

Founded in: 1987
ATV Projects India Limited was incorporated in February, 1987 to take over Anand Tanks Vessels (P) Ltd, engaged in the business of executing turnkey projects. The amalgamation was effective from September, 1987. Presently, the Company is engaged in execution of turnkey projects and supply of equipment for diverse industries such as Sugar, Fertilizer, Chemical, Petrochemicals, Steel, Power, Nuclear Power etc. by manufacturing the part of the equipments at the Mathura Plant.During 198889, an agreement was signed with Ishiwakajima Harima Heavy Industries Company, Japan, for the expansion and modernisation of the companys Mathura works. In 199495, the Mathura works were modernised. Technical and technological excellence reinforced by recognition from the American Society of Mechanical Engineers for quality control has enabled this division to book and execute orders from companies like HPCL, IOCL, Mathura Refinery, Bindal Agro and so on. The project and construction division has commissioned projects like Indian Oil Corporations Khandla Bhatinda pipeline for Jaipur and Sidhpur, LPG Horton spheres at Karnal and Jamshedpur, NTPC, Farraka and Jai Kissan SSKs sugar plant at Yavatmal, Maharashtra.In 198889, an agreement was signed with SEMTPielstick, France, to produce generating sets. In the following year, ATV signed a technical collaboration agreement with Dadini Metallurgica, Brazil, to manufacture bagassebased boilers used in sugar plants. Production commenced in 199091. In 199192, ATV entered into an agreement with a Dutch organisation, Stock Industrial Engineering, to manufacture roller mills used in sugar plants. In the same year, ATV entered into a joint venture with two leading industrialists of Malaysia to set up an integrated sugar complex. In 199091, the company entered into a technical knowhow agreement with Filex Corporation, US, to manufacture thermoplastic elastomer (TPE). The project was implemented in Mar.95 at Nagothane, Maharashtra. Two Italian companies API and Softer will import 200 tpm and 300 tpm of TPE, respectively. ATV went in for forward integration in 1995, with the commissioning of compounding lines to cater primarily to the footwear market which mainly depends on imports for TPE/SBS compounds used for soling materials. It has promoted another company ATV Petrochem a Rs 3800mln project to manufacture purified terephthalic acid (PTA).During 199697, the company commissioned and handed over a 2500 TCD Sugar Plant of M/s Akola Sahakari Sakhar Karkhana Ltd at Akola. 100 MW Power plant project and utilities of Kerala State Electricity Board for Centrales Diesel Export, France is mechanically completed and the first unit was commissioned. The company is still executing some valuable projects for the state owned oil company Indian oil Corporation, namely ARU in Panipat Refinery, LPG Sphere and Bottling Plant in Manmad and Gandhar.During the year 199798, the company was referred to the BIFR because the losses were exceeding its networth. The companys rehabilitation proposal is yet to be finalised by the IDBI, the OA and BIFR.In 2016, Company Division at Mathura was put to operation and undertaking works for Power, Cement, Sugar and other industrial sectors a heavy duty plate Bending Machine was added to augment the capacity of the Mathura Unit. The Mathura Plant became fully equipped to undertake fabrication of critical equipments required in Hydrocarbon, Cement, Hydro Power, Steel, Sugar Power sectors. It rocured new machines such as welding machine to enhance fabrication facility of Steam Distribution Duct required for air conditioning system of Power Plants during the year 201920. In 202223, it installed some additional new machines and replaced the old machines with new modern machines such as welding, drilling, Grinding, Cutting machines etc it installed a VTL (Vertical Turret Lathe) having the business operations in FY 2025.

ATV Projects India Share Price Today


As of 7 Mar 2026, ATV Projects India share price is ₹32.6. The stock opened at ₹33.2 and had closed at ₹32.4 the previous day. During today’s trading session, ATV Projects India share price moved between ₹32.50 and ₹33.20, with an average price for the day of ₹32.85. Over the last 52 weeks, the stock has recorded a low of ₹28.00 and a high of ₹44.79. In terms of performance, ATV Projects India share price has declined by 14.5% over the past six months and has declined by 1.16% over the last year.
Read More
ATV Projects India SIP Return Calculator
5,000
Over the past
Total Investment of ₹3,00,000
Monthly SIP of 5,000 would have become 12,16,054 in 5 years with a gain of 9,16,054 (+305.35%)
View details of Market Depth

ATV Projects India Fundamental

Market Cap (in crs)

173.16

Face Value

10

Turnover (in lacs)

1.85

Key Metrics

Qtr Change %
27.22% Fall from 52W High
-12.1
Dividend yield 1yr %
0

ATV Projects India Technical Analysis

Moving Averages Analysis
32.6
Current Price
Bullish Moving Averages
1
Bearish Moving Averages
15
Day EMA5
32.70
Day EMA10
33.20
Day EMA12
33.30
Day EMA20
34.00
Day EMA26
34.40
Day EMA50
35.40
Day EMA100
35.90
Day EMA200
35.70
Delivery & Volume
Loading chart...

Day

81.00%

Week

70.00%

Month

77.40%

Delivery & Volume

32.77
Pivot
Resistance
First Resistance
33.03
Second Resistance
33.47
Third Resistance
33.73
Support
First Support
32.33
Second support
32.07
Third Support
31.63
Relative Strength Index
40.19
Money Flow Index
19.92
MACD
-1.08
MACD Signal
-0.98
Average True Range
2.08
Average Directional Index
19.31
Rate of Change (21)
-9.70
Rate of Change (125)
-16.52
Compare

ATV Projects India Shareholding Pattern

Promoter
27%
Mutual Funds
0.4%
Domestic Institutions
2.3%
Public
70.7%

ATV Projects India Latest News

12 FEB 2026 | Thursday
11 FEB 2026 | Wednesday
11 FEB 2026 | Wednesday

Please be aware that ATV Projects India stock prices are subject to continuous fluctuations due to various factors.