Ashoka Buildcon Shares Jump 7% After Winning Two Orders Worth ₹4,200 Crore from NHAI and Jaipur Metro

Ashoka Buildcon rose 7% after receiving a ₹1,465 crore NHAI LoA and emerging L1 for ₹2,758.31 crore in Jaipur Metro Phase-II contracts through a JV with SAM India.
Ashoka Buildcon shares rose around 7% after the company announced a ₹1,465 crore highway contract from the National Highways Authority of India (NHAI) and emerged as the lowest bidder for Rajasthan Metro projects worth ₹2,758.31 crore in a joint venture with SAM India.
The two announcements together involve projects valued at more than ₹4,200 crore, although the Rajasthan Metro contracts are yet to be formally awarded.
Ashoka Buildcon Receives ₹1,465 Crore NHAI Contract
Ashoka Buildcon has received a Letter of Acceptance (LoA) from NHAI for an engineering, procurement and construction (EPC) project worth ₹1,465 crore, excluding GST.
The contract covers the construction of a 35.4-km, eight-lane, access-controlled section of the Vadodara-Mumbai Expressway in Gujarat. The stretch runs from Jujuwa to Gandeva.
The project will be completed under the EPC model and carries a defect liability period of 10 years. Ashoka Buildcon has 18 months to finish the work.
The company also stated in its exchange filing that its promoters, promoter group and group companies have no interest in the entity awarding the contract.
Ashoka Buildcon-SAM India JV Emerges L1 For Jaipur Metro Phase-II
In a separate filing, Ashoka Buildcon said its joint venture with SAM India had emerged as the lowest bidder for two contracts under Jaipur Metro Phase-II, awarded by Rajasthan Metro Rail Corporation Limited (RMRCL).
The combined quoted EPC price is ₹2,758.31 crore, including GST. The two packages cover elevated metro infrastructure and station construction.
Package 3 – ₹1,130.31 crore
The first contract involves the design and construction of an elevated viaduct and 12 elevated stations, including architectural finishing. The work falls under Jaipur Metro Phase-II MRTS Package 3.
The contract has been quoted on a lump-sum basis and carries a 12-month defect liability period. The completion timeline is 36 months.
Package 4 – ₹1,628 crore
The second package covers an elevated viaduct and 11 elevated stations, along with architectural finishing. It also includes modifications to part of the operational Phase-I corridor and construction of the Khasa Kothi station under Phase-I.
This project is also scheduled for completion within 36 months. Ashoka Buildcon clarified that its promoters, promoter group and group companies have no interest in the contract-awarding entity.
Ashoka Buildcon Share Price Performance
At 12:38 PM on Monday, Ashoka Buildcon’s share price stood at ₹115.18 apiece, up 3.82%. The stock has gained 10.37% over the past week and 20.82% over the past month.
The stock, however, remains down 29.12% so far in the calendar year and 33.34% over the past 12 months. Over a three-year period, it has declined 14.23%, while the five-year return stands at 18.64%.
Source
NSE Archives
This article is for informational purposes only and should not be considered investment advice from Kotak Neo. For compliance T&C and disclaimers, Visit www.kotakneo.com/disclaimer

Vishwa has spent 10+ years across fintech and FMCG doing what most people miss, connecting the dots, catching trends before they trend, and finding the angle nobody else thought to ask about.
At Kotak Neo, she drives content strategy for neoshorts, Kotak News Desk, and Investing Guide, turning market noise into something worth reading.
When she's not decoding markets, she trades charts for canvases, chasing art, painting, and architecture across cities she's yet to explore.
Right Tools, Rich Insights
