India Urges States to Sign Deals for 41 GW of Unsold Clean Energy as Storage and Grid Bottlenecks Persist

India has urged states to sign additional power purchase agreements for 41 gigawatts (GW) of clean energy capacity awaiting buyers. Rising electricity demand, inadequate battery storage and transmission bottlenecks have left the country struggling to utilise surplus renewable power while meeting evening peak demand.
India’s central government has asked state authorities to enter into additional agreements for 41 gigawatts (GW) of clean energy capacity that remains without buyers, highlighting growing challenges in matching renewable electricity generation with demand.
The appeal was made on Friday at the State Power Ministers Conference in New Delhi, where Union Minister of State for Power and New and Renewable Energy Shripad Naik called on states to plan electricity requirements earlier and secure more battery storage contracts alongside renewable energy procurement.
Rising Demand Exposes Storage Gaps
Unanticipated electricity consumption during September and October put significant pressure on India’s power grid, despite substantial solar generation capacity, Power Secretary Pankaj Agarwal said at the conference.
India’s peak electricity demand reached 271 gigawatts in May, an 11.6% increase from the corresponding period last year. Consumption was also elevated this year amid weather-related pressures associated with the El Niño pattern.
Agarwal said the country faced difficulties meeting evening demand despite having surplus clean electricity during daylight hours.
The imbalance reflects the limited availability of energy storage, which prevents excess daytime solar generation from being shifted to periods when electricity consumption rises after sunset.
Transmission Bottlenecks Add to Renewable Energy Wastage
Inadequate transmission infrastructure has further restricted India’s ability to deliver renewable electricity from generation sites to areas where it is needed.
The resulting network constraints have forced operators to scale back clean energy generation, leaving available electricity unused even as demand remains high in other parts of the system.
Naik also urged states to accelerate payments for land acquisition linked to power transmission projects. Delays in compensation disbursements have slowed infrastructure development, adding to constraints on the movement of electricity across the country.
States Asked to Improve Power Planning
The government’s push centres on better coordination between electricity demand forecasts, renewable energy procurement and storage infrastructure.
States are being asked to anticipate future consumption requirements and secure contracts in advance, rather than relying on renewable generation without sufficient arrangements to store or transmit the electricity.
India's energy transition is increasingly about more than generation capacity. Renewable power must also be stored, transmitted and delivered reliably. That makes storage infrastructure, grid expansion and timely project execution critical to meeting electricity demand.
This article is for informational purposes only and should not be considered investment advice from Kotak Neo. For compliance T&C and disclaimers, Visit www.kotakneo.com/disclaimer

Vishwa has spent 10+ years across fintech and FMCG doing what most people miss, connecting the dots, catching trends before they trend, and finding the angle nobody else thought to ask about.
At Kotak Neo, she drives content strategy for neoshorts, Kotak News Desk, and Investing Guide, turning market noise into something worth reading.
When she's not decoding markets, she trades charts for canvases, chasing art, painting, and architecture across cities she's yet to explore.
Right Tools, Rich Insights
